The kitchen cabinet painting started today, and it is hard work. The cabinets had to be sanded, primed, and painted with 2 coats. John Chris took on this project with his friend, the paint sprayer.
The kitchen with the first coat of fresh paint. It looks so great!
Our luxurious master bedroom. It is a beautiful space with concrete flooring and no electrical or vent covers. Sweet!
Clint and John Chris take a break from the terrible paint fumes. They are both are "high on Kilz" at this point, and they giggled a little too much.
The entry is being used as tool storage and a work space for our many projects.
The family room is getting a big overhaul. The baseboards have been replaced and the shutters and woodwork are all being painted. The slate floor will be removed and replaced with a neutral porcelain tile. We plan on wrapping up the first round of major projects and then we will replace the tile.